In order for the repair to please you, it is necessary to control the repair process itself and periodically do the analysis of the work carried out.
Control of the work. How to do it?
First of all, it is necessary to draw up a schedule of all work performed with the timing and subsequently strictly adhere to this schedule. The contractor must carry out all the indicated work on time. It often happens that the schedule of work for some reason is not observed for some reason. Your actions in this case depend on how fundamental to you are the deadlines for the repair. If necessary, you can hire another contractor. Of course, this will increase the financial costs of repairs, but will reduce the deadline. If the terms are not priority, it is necessary to demand compliance with the schedule, but at the same time be prepared for the fact that the deadlines may be moved away.
To monitor the quality of the work performed, you need to be a professional. But you can control something yourself. For example, the correct storage of all building materials and their rational use.
Control and acceptance of work
In the process of repair, a lot depends on employees performing all work. Therefore, the level of professionalism and labor discipline should be at the highest level. Late or earlier departure from the object are not allowed, absenteeism and unprofessional approach to the work performed are not allowed.
All building and finishing materials used in the repair process should be of high quality and meet all the necessary requirements and norms. The contractor must answer all the questions posed regarding the quality of materials.
Reception of work performed.
Reception of all work performed is usually divided into several stages depending
From the timing and types of repair and construction work. The stages of acceptance are preliminarily specified with the contractor, because financial payments depend on this.
Calculations with the contractor.
Usually, in order for the contractor to start conducting repair and construction work, you need to pay an advance. It was accepted that the first advance does not exceed the cost of materials. Sometimes it happens that your contractor has the opportunity and desire to start working at your own expense. Of course, this is the best option for you.
The subsequent calculation with the contractor is made with a certain delay. This is usually 30% of the work performed. This is beneficial primarily for your insurance, because in the event of disagreement with the contractor for one reason or another and a break with him, new performers will be needed, which will finish unfulfilled work a little more expensive.
The final calculation is paid a few days after the final acceptance of work, in order to be seen and, if necessary, to eliminate defects and shortages in time if they are discovered.
As practice shows, the more requirements for construction and installation work are precisely observed, the higher the probability of high-quality repair.