Before the construction of the house in the suburban area, significant preparation is required. Firstly, you need to remove all the dead trees, cutting them down, and in some cases you need to remove the living. In addition, you will need to remove all the garbage from the site. To complete these tasks, you will need to attract trucks and sometimes lifting equipment.
After the site is cleared from garbage and trees, it is necessary to start organizing the fence, if it was not, it is not necessary to use expensive materials to use the old slate. By the way, during the construction of the fence, it is good to organize a removable section, it will be more convenient to launch equipment into the yard, it will call from the main entry, and leave the second to leave. Thus, not cranes, not trucks will not need to unfold in the yard or hand over. But this is not all, because the exit is exit, but for transport it is still necessary to organize free travel. You should not forget to prepare the vibrational pump pump, it is now inexpensive now.
Construction is always the use of a large number of materials, and they need to be folded somewhere, it is with this that you need to decide on the course of preparing the site. Of course, places for storing materials should be near the construction and at the same time not to interfere with it.
Organization of the area of direct construction is doubly difficult task. But first, organize a building for storing some materials, as well as a place to rest, or maybe for temporary residence. To do this, you can build a shed or bring a metal trailer to the site.
The last thing to do is to bring all the necessary communications to the site. This applies to the supply of power supply, as well as water supply. In addition, you need to put a toilet on the site, without it in any way. By the way, such toilets often remain in their places and after the completion of construction.